Green Solution House 2.0

Green Solution House 2.0 is a hotel in the town of Rønne on the Danish island of Bornholm. Developed in very close collaboration between 3XN and GXN, the hotel’s design is rooted in rigorous sustainability principles with regard to materials, construction, and performance, and it is an uncompromising development of the adjoining Green Solution House completed by 3XN and GXN in 2015.

Chosen, in part, for its unrivalled sustainability credentials and ability to lock away carbon, timber is the primary construction material and provides the hotel’s structure, cladding, and insulation. The design exposes and celebrates the carefully chosen materials throughout the building, and this is immediately evident on arrival from the warm natural aesthetic of the timber cladding. The main elements of the building, including the walls and slabs, are composed of large, prefabricated cross-laminated timber (CLT) panels manufactured in a factory and simply assembled on site. This method minimizes construction time, costs and waste and ensures a high degree of accuracy in production. Comprising a standard ‘kit of parts’, an angled arrangement of simple box-like units makes up the building’s volume and forms a distinctive serrated façade while providing each room with a private, enclosed balcony and views to the surrounding natural landscape.

The design further exploits the high accuracy and repeatable process of the computer-controlled fabrication method to incorporate bespoke solutions at a much lower cost than traditional construction. Features such as elegant grills for natural ventilation are cut directly into the CLT panels, demonstrating the benefit of a holistic design approach and the synergy between design, manufacturing, and performance. The standardized design of the units also allowed the designers to carefully predict the dimensions and quantity of material offcuts, which would otherwise go to waste, and use them to create bespoke furnishings for the hotel.

Internally, exposed CLT panels continue the ethos of honest material finishes and provide a welcoming domestic character to the spaces and a consistent dialogue between exterior and interior. Generous skylights and carefully oriented glazing bring ample daylight into the interiors, reduce the need for artificial lighting, and provide a strong connection to the surroundings, while also providing natural ventilation and eliminating the need for mechanical solutions. This holistic design approach provides solutions that ensure the building will also be sustainable in operation throughout its lifetime while contributing to a healthy and uplifting interior environment for the guests and staff. Rooftop solar cells and onsite water recycling further reduce the reliance on grid-supplied resources.

A rooftop terrace and spa provide guests with a quiet retreat overlooking the adjacent woodland. Here, timber finishes are complemented by tiles of upcycled glass from local sources, providing a palette of materials reflective of the building’s focus on environmental sustainability. In this way, GSH2.0 stands as a showcase for material innovation, demonstrating that alternative circular solutions can provide an aesthetic quality and performance comparable to virgin material while offering the added benefit of a much lower carbon footprint.

With an ever-increasing focus on sustainability in architecture, it is essential that buildings can meet rigorous carbon reduction targets while retaining a focus on high-quality design and user needs. Through its intelligent, low-cost design solutions GSH2.0 sets a new standard for sustainable timber construction and provides a model for future developments to build upon.

Architects: 3XN
Location: Rønne, Denmark
Area: 102,000 m2
Photography: Adam Mørk

urbanNext (March 29, 2024) Green Solution House 2.0. Retrieved from https://urbannext.net/green-solution-house-2-0/.
Green Solution House 2.0.” urbanNext – March 29, 2024, https://urbannext.net/green-solution-house-2-0/
urbanNext April 12, 2023 Green Solution House 2.0., viewed March 29, 2024,<https://urbannext.net/green-solution-house-2-0/>
urbanNext – Green Solution House 2.0. [Internet]. [Accessed March 29, 2024]. Available from: https://urbannext.net/green-solution-house-2-0/
Green Solution House 2.0.” urbanNext – Accessed March 29, 2024. https://urbannext.net/green-solution-house-2-0/
Green Solution House 2.0.” urbanNext [Online]. Available: https://urbannext.net/green-solution-house-2-0/. [Accessed: March 29, 2024]

urbanNext | expanding architecture to rethink cities and territories

Newsletter

Sign up to our newsletter

Search
Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt
Formats
Audio&visual
Concept
Data
Essay
Forum
Lecture
Podcast
Project
Talk
Survey
Statement
Selfthink
High Density
Middle Density
Low Density
No Density

talk

essay

project

product

survey

data

all formats