Skip to content

Audio Version

See more about

More info

Architizer featured project.


Design: IF (Integrated Field Co.,Ltd.).

Client: Coro Brother Co. Ltd.

Location: Suan Pheung, Ratchaburi, Thailand.

Photographs: Ketsiree Wongwan.


Related content Life in Coro Field.
Interior designer: IF (Integrated Field Co.,Ltd.).

Landscape architect: IF (Integrated Field Co.,Ltd.).

Lighting designer: Kullakaln Gururatana.

Corporate Identity: Symbolist Co.,Ltd.

Structural engineer: Kor-IT Structural Design and Construction Co.,Ltd.

Electrical engineer: Kor-IT Structural Design and Construction Co.,Ltd.

Sanitary engineer: Kor-IT Structural Design and Construction Co.,Ltd.

Main contractor: Rattanaphon development Co.,Ltd.

Interior contractor: Rattanaphon development Co.,Ltd.

Modular furniture contractor: The Brick Design and Construction Co.,Ltd.

Softscape contractor: New TL Nature Co.,Ltd.

Signage contractor: Beetwart CNC Co.,Ltd.

Coro Field: Phase 1

Originating in the fascination with agriculture, the owner of an agriculture field on a large plot in Suan Phueng (a scenic town in Thailand) intends to bring the farm’s products and the farming lifestyle to urbanites. The first phase of the Coro project was built at the front of this plot, with the farm to serve as a prototype of farming lifestyle and the Coro products display.

In keeping with the long-term strategy, the project is soon to be extended to support the Coro project’s goals with more activities, products and experiments.

This initial development of the Coro project provides spaces for both plants and people with a design that can support different activities in response to different circumstances.

The basic dimension of 1.50 m, the ideal distance between rows in farming, defines a grid system that connects the different building conditions, ranging from open space to enclosures. Structure, skin, services, partitions, and furnishings work together to define different spaces.

IF_INTRODUCTION TO CORO FIELD PHASE I.

Moveable surfaces define the different enclosures. A modular furniture system defines different room plans. Electrical outlets on the grid structure can be adapted to different activities and different layouts.


IF_MODULAR FURNITURE IN CORO FIELD.

Consequently, the relationship of these layers generates the space’s adaptability in order to encourage creativity and diversity.

Architizer featured project.


Design: IF (Integrated Field Co.,Ltd.).

Client: Coro Brother Co. Ltd.

Location: Suan Pheung, Ratchaburi, Thailand.

Photographs: Ketsiree Wongwan.


Related content Life in Coro Field.

urbanNext (April 26, 2024) Coro Field: Phase 1. Retrieved from https://urbannext.net/coro-field-phase-1/.
Coro Field: Phase 1.” urbanNext – April 26, 2024, https://urbannext.net/coro-field-phase-1/
urbanNext February 22, 2017 Coro Field: Phase 1., viewed April 26, 2024,<https://urbannext.net/coro-field-phase-1/>
urbanNext – Coro Field: Phase 1. [Internet]. [Accessed April 26, 2024]. Available from: https://urbannext.net/coro-field-phase-1/
Coro Field: Phase 1.” urbanNext – Accessed April 26, 2024. https://urbannext.net/coro-field-phase-1/
Coro Field: Phase 1.” urbanNext [Online]. Available: https://urbannext.net/coro-field-phase-1/. [Accessed: April 26, 2024]

urbanNext | expanding architecture to rethink cities and territories

Newsletter

Sign up to our newsletter

Search
Generic filters
Exact matches only
Search in title
Search in content
Search in excerpt
Formats
Audio&visual
Concept
Data
Essay
Forum
Lecture
Podcast
Project
Talk
Survey
Statement
Selfthink
High Density
Middle Density
Low Density
No Density

talk

essay

project

product

survey

data

all formats